BOX C of E
VC PRIMARY WILTSHIRE.
The extension of an existing listed Victorian school classroom with a
glazed infill structure to provide a new reception class facility, including
a new children's toilet and wet area within the existing classroom.
HEDDINGTON
C of E PRIMARY WILTSHIRE.
The conversion of an existing disused Victorian toilet block into a new
library facility. This project involved the virtual demolition of the
existing building and rebuilding it to current standards.
HARDENHUISH,
CHIPPENHAM - Conversion of existing conference block into two new
classrooms including total refurbishment of building and pupils toilets,
new upvc windows and doors. Full refurbishment of two existing science
laboratories, including all furniture to bring them up to current standards.
LEA&
GARSDON PRIMARY, MALMESBURY - Single storey, reconstructed stone and
tile pitched roof, two classroom extension with children's toilets, glazed
link and internal alterations to provide a reception area and heads office
to the existing Victorian school with 1960s and 1970s extensions.
CORSHAM
REGIS PRIMARY - New steel frame with barrel vault polycarbonate roof
covered area and new doors to provide an outside teaching area to the
existing 1980's primary school.
PRIESTLEY PRIMARY, CALNE, WILTSHIRE.
New playground railings, fencing and hard landscape works to provide a
safer and more interesting recreational environment for the children.
PAXCROFT PRIMARY, TROWBRIDGE, WILTSHIRE.
Internal courtyard extension to an existing cloaks area of a 1970's "Method
Built" school to provide a new ICT suite facility for 30 pupils.
ASHTON KEYNES C OF E PRIMARY, WILTSHIRE.
Conversion of an existing 1960's redundant toilet block into a new ICT
suite and kitchenette.
REDLAND COUNTY PRIMARY, CHIPPENHAM, WILTSHIRE
Conversion of existing kitchen into new reception classroom with wet area,
children's toilets, cloaks lobby, staff office, staff room and kitchenette.
This project included full asbestos removal in the existing kitchen.
ST PAUL'S PRIMARY CHIPPENHAM, WILTSHIRE.
Internal alterations to store cupboards and classroom in a 1970's "Method
Built" school to provide more useful internal space and a new ICT
suite facility for 30 pupils within the existing caretakers bungalow.
WOOTTON BASSETT INFANTS WILTSHIRE.
Conversion of existing store room into new staff toilet to replace the
existing outside toilet.
HARDENHUISH, CHIPPENHAM, WILTSHIRE.
Conversion of existing conference block into two new classrooms including
total refurbishment of the building and pupils toilets, including new
upvc windows and doors.
Full refurbishment of two existing science laboratories, including suspended
ceilings, lighting, gas, electrics and all furniture to bring them up
to current standards.
UPPER AVON, DURRINGTON, SALISBURY.
New glazed entrance foyer, disabled wc and access ramp, conversion of
two existing classrooms into new library and ICT resource centre, two
music practice rooms and various other internal alterations to this 1950's
secondary school.
THE GEORGE WARD, MELKSHAM.
Conversion of existing classroom into new ICT facility and study rooms
to this 1960's secondary school.
Two new fire exit doors to existing assembly hall to provide greater use
of this facility under present regulations.
HARDENHUISH, CHIPPENHAM, WILTSHIRE.
Alterations and refurbishment of the existing 1960's two storey science/drama
block. This project involved converting the existing drama studio into
two new science laboratories, structural internal alterations to enlarge
and fully refurbish four existing science laboratories and two preparation
rooms, an internal goods lift, refurbishment of existing staff and children's
toilets, a new disabled toilet, a new air conditioned ICT suite and external
chemical store.
Conversion of the existing 1950's single storey on three levels, rural
science block into a new maths block. Internal structural alterations,
new aluminium external doors and windows, internal partitions and doors
to provide eight classrooms, an ICT suite for 30 pupils and new staff
toilets.
Construction of a double tennis and netball court.
GROVE PRIMARY, TROWBRIDGE, WILTSHIRE.
Extension of the assembly hall to provide additional floor area to this
1970's flat roof primary school.
LEA AND GARSDON PRIMARY LEA, MALMESBURY, WILTSHIRE.
Single storey, reconstructed stone and tile pitched roof, two classroom
extension with children's toilets, glazed link and internal alterations
to provide a reception area and heads office to the existing Victorian
school with 1960's and 1970's extensions.
WANSDYKE COMMUNITY PRIMARY, DEVIZES, WILTSHIRE.
Two courtyard infill extensions to the 1970's single storey flat roof
school to provide a new IT suite and Library. This project was constructed
using prefabricated structural wall panels due to the lack of accessibility
to the existing internal courtyards and to reduce the construction time
on site.
CORSHAM REGIS PRIMARY, CORSHAM, WILTSHIRE.
New steel frame with barrel vault polycarbonate roof covered area and
new external doors to provide an outside teaching area to the existing
1980's primary school.
PRIESTLEY PRIMARY, CALNE, WILTSHIRE.
Conversion of an existing classroom into an ICT suite for 30 pupils to
this 1960's two storey primary school.
GROVE PRIMARY, TROWBRIDGE, WILTSHIRE.
Single storey flat roof extension to the 1970's primary school to increase
the floor space of an existing classroom and provide a new audio logically
room for children with hearing difficulties.
ST PAUL'S PRIMARY, CHIPPENHAM, WILTSHIRE.
Two classroom extensions to increase the floor area up to required current
standard, associated internal alterations, a front entrance courtyard
infill extension to provide a new library, special needs facility and
entrance lobby.
CORSHAM PRIMARY, WILTSHIRE.
Timber framed new classroom extension between existing mobile classrooms,
including cloaks area, store and link corridor.
LYDIARD MILLICENT PRIMARY, SWINDON, WILTSHIRE.
Extension to existing Victorian school to provide two quiet teaching areas,
a store room and refurbishment of the staff room.
HILMARTON PRIMARY, WILTSHIRE.
Detached new school assembly hall including, community room, toilets,
kitchen, stores and carpark. This new build is of traditional cavity wall
construction except for the large assembly hall which has a steel portal
frame. The external finish is through coloured render with feature reconstructed
stone quoins, lintels and cills. All the external windows and doors are
polyester coated aluminium and the building has under floor heating throughout.
MANSION HOUSE PRE-SCHOOL PLAYGROUP,
CORSHAM, WILTSHIRE.
Conversion of the existing caretakers bungalow at St Patrick's Catholic
Primary School into a pre-school playgroup building. This project included
two extensions and total refurbishment of the existing building to provide
the required facilities.
ST NICHOLAS PRIMARY, BROMHAM, WILTSHIRE.
Renovation and modernisation of the Victorian classroom including, polyester
powder coated replacement windows, disabled access and ICT facilities.
|